項目總投資估算76362萬,新建水廠設(shè)計規(guī)模為20萬m3/d(供水總規(guī)模達50萬m3/d),建設(shè)內(nèi)容中的配水混合池、混凝沉淀池、V型濾池、凈化車間、清水池(兩座)、送水泵房及變配電間等按20萬m3/d規(guī)模建設(shè),排水池、排泥池、污泥濃縮池、污泥均衡池、污泥脫水車間、次氯酸鈉投加間、水務(wù)大樓等按50萬m3/d規(guī)模建設(shè)。
Total project investment estimation, 763.62 million, the newly built plant design scale of 200000 stere/day(total scale of water supply of 500000 stere/day), mix with water pool, in the content of the construction of coagulation sedimentation tank, V type filter, purifying workshop, clear water reserviors (two), water pump room and distribution room changed according to the scale of 200000 stere/day such as construction, drainage pool, mud pool, pool, sludge dewatering sludge concentration pool, sludge equilibrium between workshop, adding the sodium hypochlorite, water tower,etc according to the construction of 500000 stere/day.